A missing drawing does not stop the RFQ
Many replacement projects start with an old part, a damaged heater, a nameplate or several photos from the maintenance team.
The goal is to collect enough information to identify the configuration and clarify what still needs to be confirmed.
Useful details for replacement review
Send clear photos from multiple angles and include a ruler or caliper when possible. A nameplate photo is especially useful when voltage, wattage or part number is still readable.
- Overall length and immersion length
- Tube diameter or sheath size
- Mounting bracket, flange or over-the-side structure
- Lead length, terminal box and cable details
- Application tank and chemical medium
- Quantity and required delivery timing